Skip to content

Bow-Tie Analysis

Path: /bow-tie

Bow-Tie Analysis

Visual bow-tie risk analysis connecting threats, controls, and consequences. Useful for understanding control effectiveness and identifying gaps.

Diagrams are saved

Building a diagram saves it for your organization. Saved diagrams are listed in the Saved Diagrams table on the page, survive a reload, can be opened again with View, and can be deleted by an admin. Creating and deleting a diagram are recorded in the audit trail. There is no export or download, so take a screenshot if you need the picture in a document. The page ships hidden by default - turn it on from the sidebar's Customize popover.

How It Works

  • Left side (Threats) - What could go wrong.
  • Center (Event) - The risk event you're analyzing.
  • Preventive controls - Controls that reduce the likelihood of the event.
  • Mitigating controls - Controls that reduce the impact if the event occurs.
  • Right side (Consequences) - Potential outcomes if the event occurs.